Schedule when assigned content unlocks for learners and when it's due — all from the assignment screen.

When you assign content to a group, two optional timing controls decide when learners engage with it. The Availability Date sets when the content unlocks; the Due Date sets the deadline they work towards. Leave both blank and the content is available straight away with no deadline.

image.png

How to set availability and due dates

These settings sit inside the content assignment flow. From the Group Management page, open a group's actions menu () and choose Assign Content, then continue to the Assignment Details step. Setting up the assignment itself is covered in the guide on assigning content to a group.

  1. Open the date settings. On the Assignment Details step, click Configure Dates & Prerequisites to reveal Common Assignment Dates.
  2. Set an Availability Date (optional). Pick the date the content should unlock for learners. Leave it empty to release the content immediately — handy for scheduling a future launch.
  3. Choose a Due Date method (optional). Under Due Date, select one:
  4. Enter the number of days. For any of the relative methods, type a value in Number of days. The Preview line shows the due date this produces.
  5. Continue to Review. Click Next, check the summary on the Review step, and confirm the assignment.

Tips for best results

<aside> 💡

Pro tip: If the same content reaches a learner more than once (for example, through two groups), the earliest due date is the one that applies to them.

</aside>


Was this article helpful? Let us know — your feedback helps us keep the Knowledge Hub accurate.